A logo with black text "20th Anniversary" and a red and white "20 Years" graphic in the background.

My Shower Door and D3 Glass

2019

Commercial
Fort Myers, FL
Built by Christel Construction
Studio A.D. created a custom design for this 60,000-square-foot headquarters and fabrication facility for My Shower Door and D3 Glass in Fort Myers, Florida. The office section of the building provides well-appointed office space for the executive, sales and marketing teams, as well as for product development. The fabrication section’s design facilitates the production, storage and distribution of glass products, while the high-tech facility houses glass tempering and glazing equipment. This includes overhead cranes, which are used to move both raw and finished products inside the fabrication area. In order to run all of the high-tech equipment, this facility’s custom plan incorporated high-voltage power at 480 volts, three-phase power at 5,000 amps and three separate electrical services for the building. Christel Construction used a pre-engineered metal building, concrete block walls and pre-cast concrete hollow core planks to construct this Studio A.D. design.

Project Gallery